Battery Energy Storage Systems help UK power efficiency

Nidec ASI, of Milan in Italy, part of the appliance, commercial and industrial motor business of Nidec in Japan, has won an order from the UK-based EDF Energy Renewables business for the installation and supply of a second Battery Energy Storage System (BESS), for use on the British National Grid.

EDF ER, a renewable energy developer, is a JV company between EDF Energy in the UK and EDF Energies Nouvelles in France. As a result of this new contract, Nidec ASI will act as an EPC (engineering, procurement, and construction) contractor to supply the 49 MW BESS system that EDF ER is building to serve the National Grid, the British electricity distribution company. The contract, which follows closely after an earlier large-scale deal for a 10 MW battery energy storage system (also for National Grid) makes Nidec ASI reach a 33% market share in the British BESS systems market.

As renewable energy resources are more widely used – to reduce the environmental impact of power generation – investments in battery energy storage systems are becoming increasingly prominent. These stabilise the power grid by temporarily storing any surplus electricity generation, and discharging the saved electricity during power shortages. Last November Nidec ASI delivered the world’s largest (90 MW) BESS system to major electricity firm STEAG of Germany. As a leader in the BESS market, Nidec is committed to stabilizing the world’s power grids and contributing to realizing a low-carbon society via the spread and expansion of battery energy storage systems and high-quality state-of-the-art equipment.

EDF West Burton 2

The BESS will be installed at the EDF Energy West Burton site in Nottinghamshire, pictured above, to support the UK’s National grid.

Leave a comment